Projects > Past
Construction, operation & maintenance of pump station at DMC, main transfer lines, distribution network & reservoirs and administration building in Abdally
 

Ministry of Public Works, Kuwait

 

SE/59

 

May 2002

 

September 2004

 

111 Million

 
Page 1 of 20
• 112 Km of ductile iron pipelines through all fittings and valves, of which 97 km is dia 1200mm
• 350 Km of UPVC pipe distribution network, ranging from 200 mm to 400 mm
• Pump station comprising of 3 pumps of 3.3kv, 1500kw, delivery head 90m
• 2 nos. Reinforced concrete reservoirs with capacity of 90,000m3 & 20,000m3 each with all related structures
• All related mechanical, electrical, process piping, instrumentation & control, SCADA & telemetry works. More than 1,500,000m3 of earth work